These are some miscellaneous pictures of our future building. Below you can follow the progress of the renovation from start to finish!
Renovation progress
30 mar

Door removed in K.01

Room lab technicians (0.01)
26 mar

lamp in the hallway 1.06
23 mar

Front view, entrance
17 mar

Ventilation unit installation

Ventilation pipes

Interaction-lab doors
13 mar

Ventilation pipes

Ventilation pipes
12 mar

Ventilation pipes
9 mar

Room 0.04, waiting/break room
26 feb

Outside view
23 feb

View from the outside.

Truck full of installation materials.

Ventilation hole drilled in wall.

Hallway at room 1.04 and 1.05.
17 feb

Ventilation shaft being carried through the halls
Jan 2026
Start renovation
Phase 1