Building maintenance and construction work
Lab move – pictures
Building maintenance and construction work
Here are some pictures of the construction works in Drift 10, end of January:
This is going to be the new phonetics lab (with three booths). The second picture shows the historic ceiling construction using reed.
This will become one of the two new EEG labs.

This space will house the hair-washing room for EEG participants, and the sound-attenuated booth for the head-turn babylab. Obviously a wall separating the hair-washing room from the booth will be constructed. The marking shows where the door will be that gives access to the booth from the experimenter room (next picture).

One of the two rooms that will become the preparation/analysis/study room for the RMA students, with the opening for the door that will be made between the two spaces.