This room will be our brand-new Study/Analysis room. Once completed, it will provide a dedicated, purpose-built space for preparing experiments and analyzing data. The rooms can also be used to provide lab instruction to small groups of students (2×4), and for behavioral group experiments. Students of the RMA Linguistics are welcome to study in these rooms. Below you can follow the progress of the construction from start to finish!
Construction progress
30 mar

1.08

1.07
27 mar

Analysis room primer
17 mar

Wall painted yellow & white
27 feb

View towards the door connecting the two rooms.

View towards the door connecting the two rooms. Check out all that daylight!
26 feb

Wall painted white.

Wall on the other side painted white.
23 feb

View by night. Wall preparation drying. New door is waiting to be installed.

Wall on the other side prepared.

Wall being prepared.
12 feb

Floor removed and door placed.
3 feb

View from the other side.

Further door preparation.
Jan 2026
Start construction — Phase 1

Door preparation, this will be the link between the rooms.